Telegram分享群组(www.tel8.vip):Shah Alam Stadium job another feather to MRCB’s hat

Telegram分享群组www.tel8.vip)是一个Telegram群组分享平台。Telegram分享群组包括Telegram分享群组、telegram群组索引、Telegram群组导航、新加坡telegram群组、telegram中文群组、telegram群组(其他)、Telegram 美国 群组、telegram群组爬虫、电报群 科学上网、小飞机 怎么 加 群、tg群等内容。Telegram分享群组为广大电报用户提供各种电报群组/电报频道/电报机器人导航服务。

The RM787mil job will be carried out on a public-private partnership basis that requires MRCB to bear the entire cost of the project, which will be repaid by the Selangor state government via a land swap.

PETALING JAYA: Malaysian Resources Corp Bhd’s (MRCB) latest major refurbishment works for the Shah Alam Stadium in Selangor, once completed in 2026, will add another feather to the construction group’s hat, says MIDF Research.

The RM787mil job will be carried out on a public-private partnership basis that requires MRCB to bear the entire cost of the project, which will be repaid by the Selangor state government via a land swap.

This will allow MRCB to carry out developments that would cover the cost of the stadium refurbishment.

According to MIDF, one of the main focus for MRCB in the financial year 2022 (FY22) is to raise its cash levels.

“While it is still unclear which land(s) will be transferred to MRCB, we are expecting it/them to be located in Shah Alam, which is positive for the group for future developments, being the capital of Selangor.

“This would also boost MRCB’s land bank, which currently stands at 1,007.82 acres with a gross development value of RM33.35bil,” the research house said in its latest report.

MIDF is maintaining its FY22-FY24 earnings estimates of RM75.5mil to RM70.4mil.

,

三公大吃小棋牌游戏www.eth108.vip)(三公开船)是用以太坊区块高度哈希值开奖的棋牌游戏,有别于传统三公大吃小棋牌游戏(三公开船)棋牌游戏,三公大吃小棋牌游戏(三公开船)游戏绝对公平,结果绝对无法预测。三公大吃小棋牌游戏(三公开船)由玩家PK,平台不参与。

,

It reiterated a target price of 44 sen for MRCB, which was derived by pegging the group’s FY23 earnings per share of 1.5 to a target price-earnings ratio of 29.4 times.

The research house, which has a “buy” call on the stock, is also positive on the management’s focus to raise its cash levels this year.

This will see the group intensifying its efforts to sell off unsold property units, it added.

MIDF noted that a stronger cash position will enable MRCB to take on future public infrastructure projects that are likely to be self-funded or require upfront financing.

“We are also positive on MRCB’s Ipoh Raya Integrated Park project that was launched early last month.

“This marks the group’s diversification into the industrial and logistics development business,” it said.


转载说明:本文转载自Sunbet。

  • 评论列表:
  •  usdt场外交易平台(www.usdt8.vip)
     发布于 2022-08-28 00:01:20  回复
  • www.ipfs8.vip)是FiLecoin致力服务于使用FiLecoin存储和检索数据的官方权威平台。鲸鱼矿池官网实时更新FiLecoin(FIL)行情、当前FiLecoin(FIL)矿池、FiLecoin(FIL)收益数据、各类FiLecoin(FIL)矿机出售信息。并开放FiLecoin(FIL)交易所、IPFS云矿机、IPFS矿机出售、租用、招商等业务。你会红的

添加回复:

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。